White Street Garage – Third Level Sheltered Enclosure
Midtown Campus
Description:
This project shall provide for an enclosed walkway, extending from the northwest stair tower on the top level of the parking garage to the existing pedestrian bridge, allowing for a more convenient and safe passageway. Additional alterations include ventilation improvements to the two bridge stair towers, as well as upgrades to the overall aesthetic environment, in a concerted effort to promote a safer crossing alternative on White Street.

Type | New construction/alteration |
Project Budget | $87,500 |
Size | |
Status | In design |
Architectural Design | In-house |
Engineering Consultant | Macchi Engineers, LLC; Hartford, CT |
Target Completion | Fall 2013 |
Project administered by: | Western Connecticut State University |
Last updated: 04/16/13