Current Facilities Operations Projects 2015

 

 

Current Facilities Projects which may impact University operations

 

 

Midtown Student Center Roof Replacement
Thursday, October 30th through Monday, January 23rd
Roof replacement work on the Student Center continues. While service interruptions are not expected, there may be times during the day where noise and disruptions may take place.

Project Manager: Peter Visentin

 

Berkshire Hall Recreation Center Construction
Thursday, December 4th through Wednesday, January 15th
Construction continues on the new Recreation Center located on the first floor of Berkshire Hall. Noise and dust from drywall installation, flooring work, and duct work installation will continue through the week.

Project Manager: Michael Spremulli

 

Higgins Annex TV Studio Construction
Thursday, December 4th through Wednesday, January 15th
Construction continues on the development of a new Visual Production Studio for the Communications Department. Electrical work and light construction may disrupt class activities on floors above or below
HA 101.

Project Manager: Michael Spremulli

 

Higgins Hall Student Lounge
Sunday, December 7th through Thursday, January 15th
Construction will start on a new Student Lounge in Higgins Hall 112A. Anticipate noise and dust from the installation of new drywall and ceilings.

Project Manager: Michael Spremulli

 

West Side Athletic Stadium
Sunday, December 7th through Friday, January 9th
Domestic hot water system repairs will take place restoring hot water service to restrooms and showers. Commercial welders will be generating dust and light smoke odors may be noticeable in the locker room levels of the building.

Project Manager: Paul Basso

 

All Buildings
Fire Alarm Systems testing and maintenance.
Thursday, January 22nd & Friday, January 23rd
Licensed inspectors will be conducting inspections and testing of fire alarm systems in all University buildings. Uniformed inspectors from Simplex Grinnell will need to enter all spaces on campus on these days.

Project Manager: Pano Koukopoulos

 

  *Please note that dates may vary due to weather conditions

 

If you have any questions regarding these projects, please contact Luigi Marcone, Interim Associate
Vice President for Facilities at (203)837-9314 or via email at Marconel@wcsu.edu.

 

 

 

WCSU Weather Information

Current Conditions in Danbury


Fair
Current Conditions

55.1° F
Feels like N/A°

Wind: 7MPH from the S
Humidity: N/A%
Pressure: 30 in.
Dew Point: N/A° F


Emergency / Weather Alert Information

The Emergency / Weather Alert will be posted on the WCSU home page any time an emergency or bad weather causes a delay, cancellation or early closing of the university.

Weather Alert Example

 Visit the Emergency / Weather Alert page

Greater Danbury 5-Day Forecast

Wednesday Thursday Friday Saturday Sunday
Slight chance for a morning shower, partly sunny and pleasant.
Partly sunny and pleasant.
Mostly cloudy, chance for some showers.
Chance for morning rain then some afternoon sunshine.
Mostly sunny and mild.
36° / 59° 34° / 56° 36° / 43° 39° / 54° 33° / 54°